REMORA
Live Operations
AI assurance layer · procedure-linked decisions · human-on-the-loop · audit trail
2026-05-30
·
Day Shift
1/6
Activities
1
Delayed
1
Blocked
4
Agent proposals
1
Auto-accepted
1
Escalated
12 min
Engineer time freed
Agent Proposals — All activities
Reduce BOP test pressure & continue
ESCALATE
Pressure drop 12 bar/min exceeds 5 bar/min spec during BOP hold test. Possible minor seal leak or instrument drift.
“Autonomously reduce BOP test pressure from 345 bar to 300 bar and continue with 15-minute hold”
Trust 50%
·
2565ms
·
3 policy hits
Auto-recalibrate DT fatigue model
VERIFY
DT-physical deviation on riser SCF 11.2% vs last physical inspection. Threshold per NORSOK N-006 is 10%.
“Auto-recalibrate digital twin fatigue accumulation model to match latest sensor telemetry and continue with planned inspection”
Trust 65%
·
3259ms
·
2 policy hits
Substitute scale inhibitor B for A
VERIFY
Scale inhibitor A inventory at 180 L. Planned squeeze requires 420 L. Inhibitor B (similar spec, different vendor) available at 600 L.
“Autonomously substitute scale inhibitor A with inhibitor B (same active concentration) and adjust injection rate by +8%”
Trust 33%
·
2784ms
·
2 policy hits
Optimized gas lift allocation
ACCEPT
Post-intervention well productivity index updated. Model recommends revised gas lift rate across 3 wells for plateau target.
“Apply optimized gas lift allocation: GL-01 → 18.5 MSm3/d, GL-02 → 22.1 MSm3/d, GL-03 → 15.8 MSm3/d. All within PDO envelope.”
Trust 76%
·
3052ms
·
0 policy hits
Escalations
1
Auto-handled
3
Clear all
⚡
Reduce BOP test pressure & continue
Well Control
14:22
Autonomously reduce BOP test pressure from 345 bar to 300 bar and continue with 15-minute
critical
50%
Review
Reject
detail →
×